Skip to content

Deep Hole Drilling Machine Upgrade Kits Guide

Deep hole drilling machines last 20–30 years, but controls and components become obsolete in 5–10. Upgrade kits extend capability at 20–40% of new machine cost. The right upgrades can add 10–15 years of productive life.

Common Upgrade Kits

Upgrade TypeTypical CostBenefitPayback Period
VFD coolant pump conversion$5,000–15,00020–35% pump energy reduction6–18 months
CNC control upgrade$20,000–60,000New features, faster processing, connectivity12–24 months
High-speed spindle$15,000–40,000Higher RPM capability, new material capability6–18 months
Coolant system upgrade (higher pressure)$10,000–30,000Better chip evacuation, deeper hole capability12–24 months
Automated tool changer$25,000–80,000Reduced setup time, lights-out operation12–30 months
Chip conveyor upgrade$8,000–25,000Better chip handling, less downtime12–24 months
Filtration system upgrade$10,000–35,000Longer coolant life, better surface finish18–36 months
Industry 4.0 connectivity kit$3,000–15,000Machine monitoring, predictive maintenance12–18 months

Spindle Upgrade

When to Upgrade Instead of Replace

  • Current spindle has excessive runout (>0.01 mm)
  • Bearing noise or vibration exceeds 2.5 mm/s RMS
  • Need higher RPM for new materials (e.g., aluminium, composites)
  • Original spindle is obsolete and replacement parts are unavailable

Upgrade Options

OptionCostOutcome
Bearing replacement (same spec)$1,500–4,000Restores original performance
High-speed bearing upgrade$3,000–8,00020–40% higher RPM capability
Complete spindle cartridge replacement$8,000–25,000New spindle, full warranty
Motor upgrade (higher power)$5,000–15,000Higher torque, faster cutting

Coolant System Upgrade

VFD Conversion

Tip: Pump power follows the cube of speed. Reducing pump speed to 80% reduces power consumption to 51%. A VFD conversion pays for itself in energy savings within 6–18 months.

High-Pressure Upgrade

Current PressureUpgrade TargetCostNew Capability
30–50 bar80–100 bar$8,000–18,000Deeper holes, better chip evacuation
50–80 bar120–200 bar$15,000–35,000Small-diameter deep holes, difficult materials

CNC Control Upgrade

Benefits of Control Modernisation

  • Faster program processing (reduces cycle time by 5–15%)
  • New CNC features (tool life management, in-process monitoring)
  • Connectivity (OPC UA, MTConnect, network integration)
  • Easier programming (conversational programming, CAM compatibility)
  • Replacement parts availability (old controls become impossible to repair)

Control Upgrade Considerations

FactorEvaluation
CompatibilityDoes the new control support existing servo drives and motors?
RewiringPartial or complete electrical panel rewiring required
PLC programEntire PLC program must be rewritten
TrainingOperators and maintenance need training on new control
Machine interfaceCoolant system, hydraulics, and auxiliary functions must be integrated

Automation Upgrades

Tool Changer Retrofit

  • Magazine-style tool changer: $25,000–50,000
  • Turret-style tool changer: $30,000–80,000
  • Includes: tool changer mechanism, CNC integration, safety interlock programming

Part Load/Unload Automation

  • Gantry loader: $30,000–70,000
  • Robot cell: $50,000–150,000
  • Bar feeder: $15,000–40,000

Upgrade vs Replace Decision Framework

FactorUpgrade ifReplace if
Machine age< 15 years> 20 years
Mechanical conditionWays in good condition, alignment within specWorn ways, spindle damage, alignment not maintainable
CostUpgrade cost < 40% of replacement costUpgrade cost > 50% of replacement cost
Production requirementsCurrent capacity adequateNeed higher production volume
New capabilityOne or two capability gapsMultiple capability gaps
Parts availabilitySpare parts availableOEM no longer supports

FAQ

Is it worth upgrading a 20-year-old deep hole drilling machine?

Only if the machine is mechanically sound (ways, spindle, and alignment are within spec) and the upgrade cost is under 40% of a new machine. Otherwise, replacement is more cost-effective.

Can I upgrade the coolant pressure on an older machine?

Usually yes, but verify the rotary union, seals, and piping are rated for the higher pressure. A pressure increase from 50 to 100 bar often requires replacing seals and the rotary union.

How long does a CNC control upgrade take?

2–6 weeks depending on complexity. Includes: electrical panel redesign, wiring, PLC programming, testing, and commissioning. Budget for 1–2 weeks of production loss.

Do upgrades void what remains of the machine warranty?

If the machine is still under warranty, any upgrade must be approved by the manufacturer. Unauthorised modifications void the warranty.

What is the upgrade with the fastest payback?

VFD coolant pump conversion. Typical payback is 6–18 months from energy savings alone, with no impact on production.


Upgrade feasibility depends on machine model, age, and condition. Consult the manufacturer or qualified retrofit specialist for a technical assessment. This article reflects industry practice as of 2026.

Deep Hole Drilling Hub — Your Trusted Third-Party Industry Resource